Board
Using the Kanban board
Work visually by status, per project.
The board shows the same tasks as the grid, grouped into columns by status.
- Drag a card between columns to change its status
- Switch projects from the tab bar
- Open a card to access the full task drawer
- Use the grid when you need bulk inline editing
Was this helpful?